Code Alarm F65 Wartungshandbuch Seite 44

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 94
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 43
14.5
Manoeuvres to fold the crane "C" into the rest condition
(
only for the crane version “C”
)
(!) IT IS FORBIDDEN TO OPERATE FROM (!)
THE DOUBLE CONTROL SIDE
(!) Operate from ground control distributor side (!)
By operating the corresponding levers:
- completely reenter the extension boom sections;
- lift the inner boom close to its stroke end;
- fold the outer boom to its stroke end;
- lower the inner boom until the hook of the safety device rests on the extension
boom sections;
- extend the extension boom sections until the hook is correctly positioned to be attached;
- do not insist on the control!
- rotate the crane until the reference arrows coincide (on the column and on the base);
- fold the inner boom to its stroke end; the rest locating pin locates into its seat;
- re-position the outriggers to within the overall vehicle width as described on
Paragraph 13.
14.5
CONTROLS TO
OPERATE THE CRANE
GR2_3_4
Seitenansicht 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 93 94

Kommentare zu diesen Handbüchern

Keine Kommentare